North Charleston Sewer District's Ashley Interceptor Sewer Rehabilitation by Cured-in-Place Pipe Methodology

机译:北查尔斯顿污水处理区的阿什利拦截器污水管道修复法

获取原文

摘要

The success of the project, despite the difficult aspects of the site and the work completed can be attributed to the spirit of teamwork demonstrably applied during every stage of the project. The teamwork began with the relationship between the NCSD and WK Dickson, who have undertaken numerous challenging projects involving their collection system over the past several years. These projects require early planning, an intimate familiarity with the route of the host pipe and alternative for the bypass in the design and construction. Adjustments and field revisions on the fly are the norm, rather than the exception. The CIPP rehabilitation of other large diameter sections of the Cooper Interceptor and the Combined Interceptor served as training for the Ashley Interceptor. The marshland and roadway crossings were large obstacles, but not unique nor new to the design team. The initial planning by engineers from the NCSD and WK Dickson along with the feasibility analysis by Jacobs Engineering Group's sewer rehabilitation specialist, Stephen Lindsey, gave the confidence that the project would be successful. The affected property owners and regulatory agencies bought in and assisted as they could to facilitate finalization of the plans, permits, and regulatory agreements to allow the project to get underway. Lastly, the contractor joined the project with a cooperative, team-oriented approach and proceeded to construct the project in an efficient and professional manner. Kenny Construction demonstrated their desire to accept the challenges and execute the project. The contractor with their subcontractors and the other participants and stakeholders pulled together with cooperative efforts to complete this rather large and complex project.
机译:尽管站点的各个方面困难重重,并且已完成工作,但该项目的成功还是可以归因于团队精神,该精神在项目的每个阶段都得到了证明。团队合作始于NCSD和WK Dickson之间的关系,在过去的几年中,他们已经完成了涉及其收集系统的众多挑战性项目。这些项目需要及早进行规划,对主管管道的路线非常熟悉,并在设计和施工中替代旁路。调整和现场修订是正常的,而不是例外。库珀拦截器和联合拦截器的其他大直径部分的CIPP修复是Ashley拦截器的培训。沼泽地和人行横道是很大的障碍,但对设计团队而言并非唯一,也不是新事物。 NCSD和WK Dickson的工程师进行的最初计划,以及Jacobs Engineering Group下水道修复专家Stephen Lindsey的可行性分析,使该项目获得了成功的信心。受影响的财产所有人和监管机构尽可能地购买并提供帮助,以帮助最终确定计划,许可证和监管协议,以使该项目得以进行。最后,承包商以合作,面向团队的方式加入该项目,并以高效,专业的方式着手建设该项目。肯尼建筑(Kenny Construction)展示了他们接受挑战并执行项目的愿望。承包商及其分包商,其他参与者和利益相关者齐心协力,共同完成了这个相当大而复杂的项目。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号