Not All Projects Are Created Equal-The King County North Mercer Enatai Project Goes from 945 Alternatives to 1

机译:并非所有项目都是平等的-King County North Mercer Enatai项目从945个替代方案变为1个方案

获取原文

摘要

King County's Mercer and Enatai interceptors were built in the 1960s and extend over 14,000 ft from Mercer Island into the Enatai neighborhood of Bellevue, Washington. Some parts of the system are reaching the end of their useful lives, and future peak flows are projected to exceed the system's capacity. To address these deficiencies, the Mercer Enatai project team completed a complex alternatives analysis, which began its evaluation with over 945 potential pipeline alternatives and ultimately ended with one selected alternative. The alternatives analysis process began with the brainstorming of conceptual alignment options across the three distinct areas of the project: Mercer Island, East Channel (Lake Washington), and Bellevue. The existing North Mercer interceptor is primarily a subaqueous pipeline located within Lake Washington along the northern shoreline of Mercer Island. Any new pipeline on Mercer Island would have either significant challenges in constructing in the water in Lake Washington or on land that has experienced significant development since the 1960s, including the construction of Interstate 90 through the northern part of Mercer Island. The East Channel in Lake Washington is 1400 ft wide and separates Mercer Island from Bellevue. The existing Enatai siphon carries flows across the channel and traverses along the lake bottom and under the East Channel I-90 bridge. Any new pipeline across the channel would need to meet the complex constructability, hydraulic, and Army Corps 404 and WSDOT permitting requirements. The last pipeline segment is located in Bellevue in the Enatai neighborhood, a Native American term meaning "across the water". Aptly named, the existing Enatai interceptor carries flows from across the channel and from Bellevue, along the southern end of the Enatai neighborhood, and through the environmentally sensitive Mercer Slough. The last 2,000 ft of this pipeline segment is also supported on piles due to the soft ground, and runs under the I-90 corridor, which is also supported on piles in this area. A new pipeline alignment through Bellevue would have significant challenges in constructing in the water through the Mercer Slough or on land through the Enatai hillside. This presentation explores the complex challenges of this project, and the extensive alternatives analysis process that started with over 945 potential alternatives.
机译:金县的Mercer和Enatai拦截器始建于1960年代,从Mercer岛延伸到华盛顿州Bellevue的Enatai街区超过14,000英尺。系统的某些部分即将达到使用寿命,并且未来的高峰流量预计将超过系统的容量。为了解决这些缺陷,Mercer Enatai项目团队完成了一项复杂的替代分析,开始了对超过945种潜在管道替代方案的评估,最后以一种选定的替代方案结束了评估。替代方案分析过程始于在该项目的三个不同区域进行集思广益的概念调整方案:Mercer岛,East Channel(华盛顿湖)和Bellevue。现有的North Mercer拦截器主要是一条沿着Mercer岛北部海岸线位于华盛顿湖内的水下管线。默瑟岛上的任何新管道在华盛顿湖水域或自1960年代以来经历了重大发展的土地上建设都将面临重大挑战,包括通过默瑟岛北部建造90号州际公路。华盛顿湖的东海峡宽1400英尺,将美世岛与贝尔维尤分开。现有的Enatai虹吸管沿河道输送水流,并沿湖底并在东河道I-90桥下穿越。通道上的任何新管道都需要满足复杂的可施工性,液压以及陆军404和WSDOT的许可要求。最后一个管道段位于Enatai街区的Bellevue,这是美国原住民术语,意为“横跨水域”。现有的Enatai拦截器以恰当的名字命名,它沿着Enatai街区的南端,通过对水道和Bellevue的流动,并通过对环境敏感的Mercer Slough。由于柔软的地面,该管道段的最后2,000英尺也被支撑在桩上,并在I-90走廊下延伸,该区域也被支撑在桩上。通过贝尔维尤(Bellevue)进行新的管线布置,对于通过Mercer Slough在水中建造还是通过Enatai山坡在陆地上建造都将面临重大挑战。本演讲探讨了该项目的复杂挑战,以及从945多种潜在替代品开始的广泛替代品分析过程。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号