Design, Manufacture, and Microtunnel Construction Using Wet Retrieval of the 108-Inch Diameter Low Level Outlet at NYC's Gilboa Dam

机译:使用纽约市Gilboa大坝的108英寸直径低水位出口的湿法回收设计,制造和微隧道施工

获取原文

摘要

Schoharie Reservoir is part of the Catskill System, and one of three systems that supply water to the city of New York. Approximately 35% of the city's average daily demand is provided by the Catskill System, of which about 25% is supplied by the Schoharie Reservoir. The construction of Gilboa Dam was completed in 1926 and is comprised of a 700-ft-long earth embankment with a concrete core wall, and a 1,324-ft-long cyclopean concrete spillway with a maximum height of 160 ft. Like many reservoirs in the northeast, the capacity of the release works became restricted due to the age of the mechanical equipment, silting at outlet locations, and changes in release needs since the time of original reservoir construction. The final design of the low level outlet (LLO) was completed in June of 2014 and the project was bid in late fall of 2014 followed by award to SRJV and notice to proceed for construction in June of 2015. The project is scheduled to be completed in June of 2020 and when completed will represent one of the largest microtunnel boring machine project installations with wet retrieval ever accomplished in the United States. The 2100 linear feet of 108-in diameter Permalok steel casing will be installed in the tunnel while maintaining normal operating conditions of the Schoharie Reservoir at all times. This paper places particular emphasis on the practical applications from the view point of the owner, engineer, and manufacturer. Areas of interest include planning and design of the tunnel, the selection of tunnel lining materials, the Permalok steel casing manufacturing process, and key tunnel planning, design, and construction elements.
机译:Schoharie水库是Catskill系统的一部分,也是向纽约市供水的三个系统之一。卡茨基尔系统(Katskill System)提供了该市平均每日需求的大约35%,其中约25%由舒哈里水库(Schoharie Reservoir)提供。 Gilboa大坝的建设于1926年完成,由一个700英尺长的土堤和一个混凝土心墙和一个1,324英尺长的最大600英尺的独石混凝土溢洪道组成。在东北地区,由于机械设备的使用时间,出口处的淤积以及自原始油藏建设以来释放需求的变化,释放工作的能力受到了限制。低水位出口(LLO)的最终设计已于2014年6月完成,该项目于2014年下半年中标,随后授予SRJV,并于2015年6月通知进行施工。该项目计划于2016年完成。 2020年6月,竣工后将成为美国有史以来最大的带湿法回收的微隧道镗床项目安装之一。 2100线性英尺的直径为108英寸的Permalok钢套管将安装在隧道中,同时始终保持Schoharie水库的正常运行状态。本文从所有者,工程师和制造商的角度特别强调了实际应用。感兴趣的领域包括隧道的规划和设计,隧道衬砌材料的选择,Permalok钢套管的制造工艺以及关键的隧道规划,设计和施工要素。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号