In support of its goal to secure a long-term and sustainable water supply, the town of Castle Rock, Colorado, successfully negotiated inclusion in the regional WISE (water infrastructure and supply efficiency) project requiring the construction of a water transmission line to the South Metro WISE Authority project. The five miles of waterline was constructed within an existing Xcel Energy utility easement from the Parker Water District distribution system at Outter Marker Road to the Ray Waterman Regional Water Treatment Center. Material selection for the 5-mi 36-in. connecting line presented a significant challenge considering the overhead Xcel Energy power line along the alignment. Any metallic components of the line would require cathodic protection. The undulating terrain and rocky soils presented further challenges, including road and drainage basin crossings, requiring three horizontal directional drills (HDD), ranging from 700 to 1,700 ft in length. Installation was completed using a hybrid PVC approach, consisting of fused PVC pipe for all trenchless and restrained pipe and bell-and-spigot PVC for all else. This paper will detail the project's design and construction phases, expanding on the material options debated, and how the combination of fused and belled PVC joints minimized cathodic protection requirements and overall project costs.
机译:为了支持其确保长期和可持续供水的目标,科罗拉多州卡斯尔罗克镇成功地通过谈判,将其纳入区域WISE(水基础设施和供水效率)项目,该项目要求建设通往南部的输水管道Metro WISE Authority项目。五英里长的输水线是在现有的Xcel Energy公用事业设施中建造的,该设施从Outer Marker Road的Parker Water District配送系统到Ray Waterman地区水处理中心。 5-mi 36-in的材料选择。考虑到沿路线高架的Xcel Energy电源线,连接线提出了重大挑战。线路的任何金属组件都需要阴极保护。起伏的地形和岩石土壤带来了进一步的挑战,包括道路和排水盆地的穿越,需要三个水平定向钻机(HDD),长度在700至1,700英尺之间。使用混合PVC方法完成安装,该方法由用于所有非开挖和约束管道的熔融PVC管和用于所有其他非约束管道的钟形塞子PVC组成。本文将详细介绍该项目的设计和施工阶段,扩展所争论的材料选择,以及熔融和喇叭形PVC接头的组合如何最大程度地减少阴极保护要求和总体项目成本。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号