首页> 外文会议>IABSE conference on engineering the developing world >Key Techniques Introduction to Maputo Bridge Steel Box Girders Construction
【24h】

Key Techniques Introduction to Maputo Bridge Steel Box Girders Construction

机译:马普托桥钢箱梁施工关键技术介绍

获取原文

摘要

Maputo Bridge in Mozambique is the largest suspension bridge under construction in Africa, which adopts a double-pylon single-span steel box girder structure with a main span of 680m. The superstructure steel box girder construction faces a series of obstacles. By researching and applying the key construction techniques, such as whole-section factory manufacturing, all girders one-time ocean shipping, complex environment wharfing and lifting, new rotating cable crane erection and site connection, and etc., the project achieved the purpose of period guarantee, quality control, environmental impact reduction and suspension bridge construction technology promotion. Furthermore, it is expected to provide a reference and engineering example for similar large-scale bridge projects in the future.
机译:莫桑比克的马普托桥是非洲在建的最大悬索桥,采用双塔单跨钢箱梁结构,主跨为680m。上部结构钢箱梁的施工面临一系列障碍。通过研究和应用全断面工厂制造,所有大梁一次性运输,复杂的环境码头和起重,新的旋转式电缆起重机的架设和现场连接等关键施工技术,该项目达到了目的。期限保证,质量控制,减少环境影响和吊桥施工技术推广。此外,有望在将来为类似的大型桥梁项目提供参考和工程实例。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号