首页> 外文会议>World environmental and water resources congress >Case Study: Flow Measurement and Control in Walker River Irrigation District
【24h】

Case Study: Flow Measurement and Control in Walker River Irrigation District

机译:案例研究:沃克河灌区流量测量与控制

获取原文
获取外文期刊封面目录资料

摘要

Walker River Irrigation District (WRTD) is located in Nevada around the community of Yerington and contains approximately 95,000 hectares (235,000 acres), 32,000 hectares (80,000 acres) of which are irrigated. The district operates a canal system centered around the three forks of the Walker River. Starting in 2009, the district has worked with the Irrigation Training and Research Center (ITRC) to modernize its system by improving the accuracy of the measured diversions from the Walker River and enhancing the real-time control capabilities of the water managers. A "package" was developed for the headworks of canals diverting water from the river, consisting of a combination of the following based on site conditions: a Replogle flume for flow measurement, a self-contained motorized slide gate(s) in a district-standard configuration, a remote terminal unit(RTU) for automatic control of the slide gate(s) and communication with the office base station in Yerington (SCADA), an ITRC flap gate and modifications to the existing spill structure, sediment control features, and off-grid solar power for the entire site. To date, variations of the package have been successfully applied at over ten sites throughout the district, with more sites in progress and planned for the future. Modifications to the initial package have been made over the last eight years to reflect advances in technology, challenges found at completed sites, as well as additional needs identified at the sites. The district plans on continuing the modernization based on the success of the program to date.
机译:沃克河灌溉区(WRTD)位于内华达州Yerington社区周围,占地约95,000公顷(235,000英亩),其中32,000公顷(80,000英亩)被灌溉。该地区经营着一条以沃克河三岔口为中心的运河系统。从2009年开始,该地区与灌溉培训和研究中心(ITRC)合作,通过提高对沃克河引水量的精确度并增强水管理者的实时控制能力,实现系统的现代化。开发了一个“套件”,用于从河道引水的渠首工程,包括以下根据现场情况的组合:用于流量测量的Replogle槽,位于地区的独立电动滑门。标准配置,用于自动控制滑门和与Yerington的办公室基站(SCADA)通信的远程终端单元(RTU),ITRC翻板门以及对现有溢出结构,泥沙控制功能的修改,以及整个站点的离网太阳能。迄今为止,该软件包的变体已成功应用于整个地区的十多个站点,还有更多站点正在进行中,并计划在将来进行。在过去的八年中,已经对初始软件包进行了修改,以反映技术的进步,已建成站点中发现的挑战以及站点中确定的其他需求。该学区计划根据迄今为止该计划的成功,继续进行现代化改造。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号