首页> 外文会议>Construction research congress >Stochastic Time-Cost-Quality Trade-Off Analysis: The PERT Approach
【24h】

Stochastic Time-Cost-Quality Trade-Off Analysis: The PERT Approach

机译:随机时间成本质量权衡分析:PERT方法

获取原文

摘要

The main objectives of construction projects are to complete the project according to an available budget, within a planned schedule, and to achieve a pre-specified extent of quality. Therefore, time, cost, and quality are of the most fundamental attributes that determine the success of construction projects. It is vital to strike a balance between these three conflicting objectives, since no one solution can be optimal for all the three objectives. For the aforementioned purpose, a stochastic model is developed to optimize the total duration, cost, and quality of construction projects considering uncertainty by applying the program evaluation and review technique (PERT). To validate the developed model, it was applied to a case study. Results obtained by the developed model demonstrated its effectiveness and efficiency in analyzing stochastic time-cost-quality trade-off problems.
机译:建设项目的主要目标是在计划的时间表内根据可用预算完成项目,并达到预先指定的质量水平。因此,时间,成本和质量是决定建设项目成功与否的最基本属性。在这三个相互矛盾的目标之间取得平衡是至关重要的,因为对于这三个目标而言,没有一种解决方案是最佳的。出于上述目的,开发了一种随机模型,通过应用程序评估和审查技术(PERT)来考虑不确定性,从而优化建设项目的总工期,成本和质量。为了验证开发的模型,将其应用于案例研究。通过开发的模型获得的结果证明了其在分析随机时间-成本-质量权衡问题方面的有效性和效率。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号