Front End Engineering Design (FEED) for Large Industrial Projects: FEED Maturity and Its Impact on Project Cost and Schedule Performance

机译:大型工业项目的前端工程设计(FEED):FEED的成熟度及其对项目成本和进度绩效的影响

获取原文

摘要

Assessing the maturity of front end engineering design (FEED) for large industrial projects is a critical task with significant influence on overall project success. The owner's expectation is to be able to make informed decisions including cost and schedule predictions to determine whether the project should proceed to the next phase, the level of contingency needed for the project, and the predicted impact of FEED maturity on the success of follow-up phases. The primary objective of this paper focuses on FEED maturity and its impact on project performance in terms of cost change and schedule change. The authors collected data from 33 completed large industrial projects representing over $8.83 billion of total installed cost. A key result is that projects with high FEED maturity outperformed projects with low maturity by 20 percent in terms of cost growth in relation to the approved budget at Phase Gate 3.
机译:评估大型工业项目的前端工程设计(FEED)的成熟度是一项至关重要的任务,对整个项目的成功有重大影响。所有者的期望是能够做出明智的决定,包括成本和进度预测,以确定该项目是否应进入下一阶段,该项目所需的应急水平以及FEED成熟度对后续成功的预期影响-阶段。本文的主要目标集中在FEED成熟度及其对项目绩效的影响方面,包括成本变化和进度变化。作者从33个已完成的大型工业项目中收集了数据,占总安装成本超过88.3亿美元。关键结果是,相对于阶段3登机口的批准预算,就成本增长而言,高FEED成熟度的项目比低成熟度的项目要高出20%。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号