首页> 外文会议>International ocean and polar engineering conference;International Society of Offshore and Polar Engineers >Application of RPD on Spudcan Sliding during Jack-up Installation near the Footprints
【24h】

Application of RPD on Spudcan Sliding during Jack-up Installation near the Footprints

机译:RPD在靠近占地面积的自升式安装过程中在Spudcan滑行中的应用

获取原文

摘要

Before well repairing operation, it is often necessary to install the jackupvery close to the existing spudcan pits, which called footprints. Thespudcan is prone to slide towards the footprint in this process, whichcan lead to damage of legs, jacking system and the hull structure. RPD(Rack Phase Difference) system can monitor the rack vertical phasedifference of adjacent chord of truss type leg. In this paper, the RPDcalculation principle is studied and an available analysis method ofcritical RPD applicable to spudcan sliding condition is obtained. Themethod can provide useful guidance to the designers and operators.
机译:在进行修井作业之前,通常需要安装自升式升降机 非常接近现有的起毛坑(称为脚印)。这 在此过程中,spudcan倾向于滑向足迹,这 会导致腿,顶升系统和船体结构的损坏。 RPD (机架相位差)系统可以监控机架垂直相位 桁架型腿相邻弦的差异。在本文中,RPD 研究了计算原理并提出了一种可行的分析方法 获得了适用于桩靴滑动条件的临界RPD。这 该方法可以为设计人员和操作人员提供有用的指导。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号