In-Place Stabilization for the Rehabilitation of Taxiway S at Nashville International Airport

机译:纳什维尔国际机场滑行道S修复的就地稳定

获取原文

摘要

At Nashville International Airport, Taxiway S is a parallel taxiway to Runway 2C-20C constructed in concrete and asphalt and divided in 8 different sections. The asphalt sections between Taxiway N and S5 were the most deteriorated and required rehabilitation due to the amount of distresses recorded. Distresses included load and climate related cracking, weathering and raveling. The pavement was estimated to be more than 40 years old with the last recorded mill and overlay rehabilitation conducted in 1983. The pavement investigation revealed that the asphalt sections did not have the structural capacity to carry the anticipated traffic operations. Replacement was initially considered as the only alternative since a structural overlay was not feasible due to violations to the runway's primary surface. Removing the entire pavement full-depth was an expensive alternative; therefore, other alternatives such as stabilizing the existing aggregate base to provide a stronger base over the soft clayey subgrade were considered. The initial plan was to stabilize 10 inches of aggregate base in-place to avoid exposing the underlying clayey soil. After the base was completed a 9-inch asphalt layer was to be constructed. In theory, the approach was feasible but the limited number of subcontractors in the area was a challenge. After a detailed evaluation that included life cycle cost analysis, risk assessment, sustainability and availability of contractors, the in-place stabilization of the existing aggregate base was selected. The Federal Aviation Administration P-304 specification was modified for the in-place stabilization process. This paper briefly discusses the planning, design and construction considerations conducted for the completion of this project.
机译:在纳什维尔国际机场,滑行道S是与2C-20C跑道平行的滑行道,由混凝土和沥青制成,分为8个不同部分。滑行道N和S5之间的沥青路段损坏最严重,需要进行修复,原因是所记录的遇险数量大。困境包括与载荷和气候有关的破裂,风化和撕裂。估计该路面已有40多年的历史,最近一次记录的磨坊和覆盖层修复是1983年进行的。路面调查显示,沥青路段的结构能力不足以进行预期的交通运营。起初,替换是唯一的选择,因为由于违反了跑道的主要表面,所以结构上的覆盖是不可行的。全深度清除整个人行道是一种昂贵的选择。因此,考虑了其他替代方案,例如稳定现有的骨料基础,以在软质黏土路基上提供更坚固的基础。最初的计划是在原地稳定10英寸的骨料基料,以免暴露下面的黏土。基地完成后,将建造一个9英寸的沥青层。从理论上讲,这种方法是可行的,但是该地区分包商数量有限是一个挑战。在进行了包括生命周期成本分析,风险评估,可持续性和承包商可用性的详细评估之后,选择了现有总体基础的就地稳定性。联邦航空管理局P-304规范已针对就地稳定过程进行了修改。本文简要讨论了为完成该项目而进行的规划,设计和施工注意事项。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号