首页> 外文会议>Pipelines conference >Design and Construction of Camanche Water Transmission Pipeline Project
【24h】

Design and Construction of Camanche Water Transmission Pipeline Project

机译:卡曼奇输水管道工程设计与施工

获取原文

摘要

The East Bay Municipal Utility District (District) is a major metropolitan water district located near San Francisco, California. The District recently completed the design and construction for the Camanche Water Transmission Pipeline Project (Project), which is an element of the Camanche South Shore Water Treatment Plant (WTP) Replacement Project. It allows the Camanche South Shore WTP to supply water to the Camanche North Shore Recreation Area and to provide raw water from the Mokelumne Aqueducts to the new WTP. With the limited precipitation in 2014 and several years of drought in prior years, Camanche Reservoir was at its lowest water level in over 30 years, which shortened the length of the submerged pipeline from 4,700 feet to 1,200 feet. This condition allowed the majority of the cross-lake pipeline to be constructed in the lakebed with direct burial construction versus construction over water (submerged). The low water conditions allowed for a better pipeline construction at a significant cost savings for the District. This paper focuses on the float-and-sink pipeline design and construction.
机译:东湾市政公用事业区(区)是位于加利福尼亚州旧金山附近的主要都会水区。地区最近完成了Camanche输水管道项目(项目)的设计和施工,该项目是Camanche南岸水处理厂(WTP)替换项目的组成部分。它允许Camanche南岸污水处理厂向Camanche北岸娱乐区供水,并从Mokelumne渡槽向新的WTP提供原水。由于2014年降雨有限,以及前几年的干旱,卡曼奇水库的水位处于30多年来的最低水平,这使淹没管道的长度从4,700英尺缩短到1,200英尺。这种情况使得大部分跨湖管道都可以在湖床中进行直接埋葬施工,而不是在水上施工(淹没)。低水条件使更好的管道建设成为了学区的一大笔成本节约。本文着重于浮沉管道的设计与施工。

著录项

  • 来源
    《Pipelines conference》|2017年|420-430|共11页
  • 会议地点
  • 作者

    George Chiu;

  • 作者单位
  • 会议组织
  • 原文格式 PDF
  • 正文语种
  • 中图分类
  • 关键词

  • 入库时间 2022-08-26 14:32:36

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号