首页> 外文会议>Sessions of grouting >Errors, Misunderstandings, and Mistakes in Remedial Grouting Projects for Dams
【24h】

Errors, Misunderstandings, and Mistakes in Remedial Grouting Projects for Dams

机译:大坝修补灌浆项目中的错误,误解和错误

获取原文

摘要

The technical revolution in remedial grouting for dams is well into its second decade of practice in the U.S. Technical papers, textbooks and Government guidelines have been published detailing what is now considered the state of that practice. Many large projects have been undertaken in very challenging technical and dam safety situations, and experiences have been shared. However, the authors still find that not all participants in this field truly appreciate the details and subtleties of our current practice and certain poor practices from earlier decades are beginning to resurface. This paper highlights some of these issues, and offers plain guidance on: 1. Design Aspects (such as the number of grout hole rows and maximum safe water testing and grouting pressures. 2. Construction Details (such as the true value of an engineered, concrete working platform, the use of Water-Powered Down-the-Hole Hammers, the difference between Refusal and Closure, and the correct placement of standpipes for epikarst treatment). 3. Analytical Details (the difference between real and Apparent Lugeon values, and their relation to residual permeability). 4. QA/QC Aspects (such as tolerable ranges for fluid grout properties, and the necessity to have a functional DMS system). 5. Dam Safety Monitoring (such as the need for Joint Instrumentation Monitoring Programs, and long-term performance monitoring). The authors trust that this paper will be of interest and value to owners, engineers and contractors alike, since all parties are (or should be) committed to ensuring a project that is successful in the eyes of all.
机译:在美国,大坝补救性灌浆技术革命已经进入实践的第二个十年。技术论文,教科书和政府指南已经发表,详细介绍了目前认为这种实践的状态。在非常具有挑战性的技术和大坝安全情况下进行了许多大型项目,并分享了经验。但是,作者仍然发现,并非该领域的所有参与者都真正地欣赏到我们当前实践的细节和微妙之处,并且几十年前的某些不良实践开始浮出水面。本文重点介绍了其中的一些问题,并针对以下方面提供了明确的指导:1.设计方面(例如灌浆孔排的数量以及最大的安全水测试和灌浆压力。)2.施工细节(例如工程技术人员的真实价值,具体的工作平台,使用水力潜孔锤,拒绝和关闭之间的差异以及用于表岩溶处理的竖管的正确放置)3.分析细节(实际和表观Lugeon值之间的差异,以及它们与残余渗透率之间的关系)4.质量保证/质量控制方面(例如,灌浆性能的容许范围,以及必须具有正常运行的DMS系统)5.大坝安全监控(例如,需要联合仪表监控计划,以及长期的性能监控)。作者相信,本文对所有人,工程师和承包商都将是有意义和有价值的,因为各方(或应该)致力于确保项目的成功进行。在所有人眼中都是成功的。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号