...
首页> 外文期刊>Corrosion & Materials >Rio Tinto Dampier Salt Operations Mistaken Island Mooring Dolphin Repair Project
【24h】

Rio Tinto Dampier Salt Operations Mistaken Island Mooring Dolphin Repair Project

机译:力拓丹皮尔盐业公司错误岛停泊海豚修复项目

获取原文
获取原文并翻译 | 示例
           

摘要

The Rio Tinto Dampier Salt Limited mooring dolphins were constructed in 1971 in conjunction with the load out wharf and ship-loader platform at Mistaken Island in the Burrup Peninsular Archipelago, 1250km north east of Perth and 21km northwest of Karratha in Western Australia. The kolphins or ship berthing stations are used for the shipping of up to 4.2 million tonnes of salt per annum. The dolphins comprise seven reinforced concrete platforms 7.5m long × 4.57m wide by 1.55m to 2.15m deep supported by ten steel encased reinforced concrete driven piles.
机译:Rio Tinto Dampier Salt Limited的系泊海豚于1971年与Burrup半岛的Mistaken岛,珀斯东北1250公里,西澳大利亚卡拉萨西北21公里处的卸货码头和装船平台一起建造。海豚或停泊站每年用于运送多达420万吨盐。海豚由七个钢筋混凝土平台组成,这些平台长7.5m×宽4.57m,宽1.55m至2.15m,由十个钢包裹的钢筋混凝土驱动桩支撑。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号