首页> 外文会议>Structural Stability Research Council annual stability conference >Partial Depth Precast Concrete Deck Panels on Curved Bridges
【24h】

Partial Depth Precast Concrete Deck Panels on Curved Bridges

机译:弯曲桥梁上的局部深度预制混凝土桥面板

获取原文

摘要

A critical loading phase on steel I-girder bridges from a stiffness and strength perspective is the placement of the concrete bridge deck. At this stage, the non-composite steel girders resist the entire construction load. Traditionally, intermediate cross-frames or diaphragms are used to provide stability during construction; however alternative forms of bracing are of interest -especially those that increase construction speed and improve economy of the system. While partial-depth precast concrete deck panels (PCP) are often only used as stay-in-place formwork on straight bridges, they have significant in-plane stiffness and strength. With an adequate connection between the PCPs and the top flanges of the steel girders, the PCPs can provide significant contributions to the stability of both straight and curved bridges during construction. This paper documents results of an ongoing research study focused on the development of connection details for PCP bracing applications and the effectiveness of using the PCPs as braces during construction. The experimental portion of this study consists of full-scale laboratory tests on a 72 ft span twin girder system, monitoring the behavior of the system under simulated construction loads for straight and simulated curved girders. Buckling tests were carried out with and without intermediate bracing using a cross frame at midspan. The impact of the addition of the PCPs connected near the ends of the girders were evaluated with the laboratory tests. Additionally, parametric studies with a validated finite element analysis (FEA) of the system will be carried out to evaluate a wider array of systems.
机译:从刚度和强度的角度来看,钢制工字钢桥的关键荷载阶段是混凝土桥面板的布置。在此阶段,非复合钢梁可抵抗整个施工荷载。传统上,中间的交叉框架或隔板用于在施工过程中提供稳定性。然而,支撑的替代形式值得关注-尤其是那些可以提高构造速度并改善系统经济性的支撑。虽然部分深度的预制混凝土面板(PCP)通常仅用作直桥上的固定模板,但它们具有显着的面内刚度和强度。通过PCP和钢梁顶部凸缘之间的适当连接,PCP可以在施工过程中为直桥和弯桥的稳定性做出重要贡献。本文记录了一项正在进行的研究结果,该研究专注于PCP支撑应用的连接详细信息的开发以及在施工过程中将PCP用作支撑的有效性。这项研究的实验部分包括在72英尺跨距双梁系统上进行的全面实验室测试,在直线和模拟弯梁的模拟建筑载荷下监控系统的性能。使用中跨横框架在有或没有中间支撑的情况下进行屈曲测试。通过实验室测试评估了添加连接在大梁末端附近的PCP的影响。此外,将使用经过验证的系统有限元分析(FEA)进行参数研究,以评估更广泛的系统。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号