Soil Mixing for the SR-83 Project in Florida

机译:佛罗里达州SR-83项目的土壤搅拌

获取原文
获取外文期刊封面目录资料

摘要

SR 83/US 331 is a primary North/South roadway in Walton County that is a crucial link for tourism and commerce between the Walton County beaches and the heavily traveled I-10 corridor in the panhandle of Florida. The facility also serves as the primary hurricane evacuation route from southern Walton County. This 3.4 mile project involves expanding the current two-lane crossing of Choctawhatchee Bay to a four-lane facility to increase capacity and dramatically improve mobility within the corridor. One of the major goals of the project is to perform ground stabilization using deep and shallow soil mixing (DMM & SMM) along existing causeways. Ground stabilization was required due to the existence of moderately deep very loose soils that have settled considerably over the years. As a result, the Florida Department of Transportation (FDOT) incurred significant maintenance expenses and was unable to maintain an acceptable ride quality. The FDOT considered soil mixing as one option to control this settlement. A design was developed using a combination of SMM and DMM to transfer the loads to the more competent underlying strata. A complete field test program was performed to determine the appropriate mixes to utilize for the soil mixing given the high variability of the existing soils. Once the field test program was complete, a full scale load test along with a Plate Load Test was performed on a completed section of the South Causeway to ensure the FDOT required settlement criterion was met. The results of this test program confirmed the design assumptions and this paper will give an overview of the project with emphasis on the test program.
机译:SR 83 / US 331是沃尔顿县的主要南北道路,对于沃尔顿县的海滩和佛罗里达泛滥的I-10走廊之间的旅游和商业活动至关重要。该设施还用作从南部沃尔顿县撤出的主要飓风疏散路线。这个3.4英里的项目涉及将Choctawhatchee湾目前的两车道交叉口扩大到四车道设施,以提高通行能力并显着改善走廊内的流动性。该项目的主要目标之一是利用沿现有堤道的深层和浅层土壤混合(DMM和SMM)进行地面稳定。由于存在多年沉降的中等深度非常松散的土壤,因此需要进行地面稳定处理。结果,佛罗里达州交通运输部(FDOT)发生了大量的维护费用,并且无法保持可接受的乘车质量。 FDOT认为土壤混合是控制这种沉降的一种选择。使用SMM和DMM的组合进行了设计,以将载荷转移到功能更强的基础层中。考虑到现有土壤的高度可变性,执行了完整的现场测试程序来确定用于土壤混合的合适混合料。现场测试程序完成后,将在South Causeway的已完工部分进行全面载荷测试以及板式载荷测试,以确保满足FDOT要求的沉降标准。该测试程序的结果证实了设计假设,并且本文将对该项目进行概述,重点是测试程序。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号