首页> 外文会议>Sessions of grouting >Jet Grouting within Contaminated Land Fill
【24h】

Jet Grouting within Contaminated Land Fill

机译:在受污染的垃圾填埋场进行喷射灌浆

获取原文
获取外文期刊封面目录资料

摘要

The site of the Barangaroo Project forms part of an old Sydney Gas Works and is heavily contaminated with hazardous materials A perimeter retention wall is to be created with minimum UCS strengths of 5MPa. Construction of this wall involves overlapping jet-grouting columns, performed within negative pressurised tents with all personnel subjected to fully enclosed hazardous PPE and controlled decontamination procedures. Two fluid jet grouting was considered to be of high risk to personnel due to creating a high level of airborne contaminates within the tent. Single fluid jet grouting utilising a patented optimized monitor enabled the construction of columns up to 1.8m in diameter in typical sandy clays and coal tars. This paper describes the jet grouting works with focus on hydration of slag base cements within coal tar environments, environmental protection procedures, contamination controls and there overall effectiveness, as well as specific spoil management.
机译:Barangaroo项目的场地是旧的悉尼天然气厂的一部分,并被危险材料严重污染。将建造一个最小UCS强度为5MPa的周界挡土墙。这堵墙的施工涉及重叠的注浆柱,这些柱子在负压帐篷内进行,所有人员均应完全封闭并进行危险的PPE和受控的净化程序。由于在帐篷内产生大量的空气传播污染物,人们认为两次注浆会对人员造成高风险。利用获得专利的优化监测器进行单流体喷射灌浆,可以在典型的沙质粘土和煤焦油中构造直径最大为1.8m的立柱。本文介绍了喷射注浆工作,重点是煤焦油环境中矿渣基水泥的水化,环境保护程序,污染控制及其总体有效性以及具体的弃渣管理。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号