Factor Analysis of Construction Delays in the U.S. Construction Industry

机译:美国建筑业施工延误的因素分析

获取原文

摘要

Delays in completing construction projects is one of the most common problems of the construction industry, and has a detrimental effect on all triple-bottom lines of sustainability (i.e., social, environmental, and financial). Considering the numerous negative consequences of construction activities, particularly for the environment, efforts should be taken to minimize the duration of the construction phase and the risk of delays. This study involved empirical research about the causes of delay in the U.S. construction industry. It was based on the findings of a nationwide survey, and targeted experienced experts in the construction industry in order to study the causes of delays in construction projects. The survey results showed that excessive change orders and delay in decision making process played a significant role in causing delays. The factor analysis results indicated that 14 delay causes can be extracted and grouped into four categories namely, communication, decision making process, designer's inefficiency, and contractor' efficiency. These findings could be used to combine together delays causes, so that the root causes of delays could be determined.
机译:延迟完成建设项目是建筑业最普遍的问题之一,对所有三重底线的可持续性(即社会,环境和财务)都具有不利影响。考虑到建筑活动,特别是对环境的众多负面影响,应努力使建筑阶段的持续时间和延误风险最小化。这项研究涉及对美国建筑业延误原因的实证研究。它是基于一项全国性调查的结果,针对建筑业经验丰富的专家,以研究建筑项目延误的原因。调查结果表明,过多的变更单和决策过程中的延迟在造成延迟方面起着重要作用。因子分析结果表明,可以提取出14个延误原因,并将其分为沟通,决策过程,设计者的低效率和承包商的效率四类。这些发现可用于将延迟原因组合在一起,以便可以确定延迟的根本原因。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号