首页> 外文会议>International conference on sustainable infrastructure >Factor Analysis of Construction Delays in the U.S. Construction Industry
【24h】

Factor Analysis of Construction Delays in the U.S. Construction Industry

机译:美国建筑业建设延误因子分析

获取原文
获取外文期刊封面目录资料

摘要

Delays in completing construction projects is one of the most common problems of the construction industry, and has a detrimental effect on all triple-bottom lines of sustainability (i.e., social, environmental, and financial). Considering the numerous negative consequences of construction activities, particularly for the environment, efforts should be taken to minimize the duration of the construction phase and the risk of delays. This study involved empirical research about the causes of delay in the U.S. construction industry. It was based on the findings of a nationwide survey, and targeted experienced experts in the construction industry in order to study the causes of delays in construction projects. The survey results showed that excessive change orders and delay in decision making process played a significant role in causing delays. The factor analysis results indicated that 14 delay causes can be extracted and grouped into four categories namely, communication, decision making process, designer's inefficiency, and contractor' efficiency. These findings could be used to combine together delays causes, so that the root causes of delays could be determined.
机译:完成建设项目的延误是建筑业最常见的问题之一,对所有三层可持续发展有不利影响(即社会,环境和财务)。考虑到施工活动的许多负面后果,特别是对于环境,应采取努力,尽量减少施工阶段的持续时间和延误的风险。本研究涉及关于美国建筑业延迟原因的实证研究。它基于全国范围内的调查结果,并针对建筑业的经验丰富的专家,以研究建设项目延误的原因。调查结果表明,在造成延误时,决策过程的过度变化和延误在造成延误方面发挥了重要作用。因子分析结果表明,可以将14个延迟原因提取并分为四个类别,即通信,决策过程,设计师的低效率和承包商的效率。这些发现可用于组合在一起延迟原因,从而可以确定延迟的根本原因。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号