China's Underground Comprehensive Utility Tunnel Project of PPP Mode Risk Identification

机译:中国地下综合隧道工程的PPP模式风险识别

获取原文

摘要

Currently, China is facing the critical window of construction on the underground comprehensive utility tunnel project. Accurate risk identification is required, as the prerequisite for the realization of reasonable risk sharing between the administration and the private sectors. Utilizing Delphi method, opinions from 10 representative experts in the professional field were investigated and collected to identify 15 categories of risk, which are faced by the PPP scheme of underground integrated corridor project in China through four rounds of consultation. By analyzing the relationship between the identified risk factors by using the analytical ISM model, it is concluded that there are progressive relations among the risk factors, and there are two sets of strong correlation factors in the system that should be regarded as the dominating risk management.
机译:目前,中国正面临着地下综合公用事业隧道项目的批判窗口。需要准确的风险识别,作为实现政府与私营部门之间合理的风险共享的先决条件。利用Delphi方法,调查和收集了来自专业领域的10个代表专家的意见,以确定15类风险,通过四轮咨询,在中国的地下综合走廊项目的PPP计划面临。通过使用分析ISM模型分析所识别的风险因素之间的关系,得出结论,风险因素之间存在渐进关系,并且系统中存在两套强大的相关因素,应被视为主导风险管理。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号