A Novel Blend of Karst Grouting and Micropile Placement Techniques for Stabilizing Difficult Foundation Conditions in Weak Vuggy Limestone

机译:岩溶灌浆和微厚放置技术的一种新型混合,用于稳定弱佛武士石灰岩困难的基础条件

获取原文

摘要

This case study describes the grouting aspects of the foundation improvements carried out to remediate the settlement distress of a partially constructed new building located on the west coast of the Caribbean island of Barbados. The foundation remediation ultimately included the construction of a 280-foot-long sub-surface 'sea-wall', the installation of 174 micro-piles (providing direct and indirect support to the building) and the grouting of voids and interconnected fissures/fractures in the weak, vuggy, uncemented coralline limestone strata underlying the building foundations. An investigation of the cause(s) of the settlement, a flexible remediation design, and close monitoring of the drilling and grouting operations during construction were essential to the success of the project. In addition, contractor procurement and operation, based on an 'Alliance' contractual concept resulted in an excellent consultant-contractor team relationship throughout. This was key to the completion of the work within the tight schedule required by the owner.
机译:本案例研究介绍了对位于巴巴多斯的加勒比海岛西海岸的部分建成的新建筑的结算窘迫进行了基础改进的灌浆方面。基础修复最终包括建造280英尺长的子面'海墙',安装174个微桩(为建筑物提供直接和间接支撑)以及空隙和互连裂缝/裂缝的灌浆在弱势,沃格吉,未提出的珊瑚石灰石地层底层建筑基础。对施工的稳定性修复设计和施工过程中钻井和灌浆操作的密切监测的调查对于项目的成功至关重要。此外,承包商采购和运作,基于“联盟”的合同概念,导致整个顾问 - 承包商团队关系。这是在业主要求的紧张时间表内完成工作的关键。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号