Integrating Activities Risk and Traffic Microsimulation Data for Temporal Risk Assessment in Construction Work Zones: A Proof of Concept

机译:集成活动风险和交通微观模拟数据以进行施工作业区域的临时风险评估:概念验证

获取原文

摘要

Construction work zones impose mobility constraints and remain major contributors toward incidents on our highways. Pro-active hazard identification and risk assessment is necessary in order to remediate the occurrences of incidents. The existing framework and applications in literature are not adequate in assimilating the hazards posed by both the construction activities and the dynamic flow of traffic in daily safety planning. This paper proposes a novel framework that leverages the capabilities offered by models in both construction safety models and traffic engineering domains to address this problem. Specifically, this study systematically integrates the outcomes from activity-based construction risk assessment and simulation-based traffic conflicts assessment for quantifying daily risk in highway construction. The application of this framework is demonstrated by a numerical example analogous to practice. Results indicate that enhancing the risk assessment of construction activities by chronologically integrating them with traffic conflicts around work zones capture safety hazards more realistically and completely. The integrated safety assessment index developed in this study will assist in accurate representation of risky work zone periods to devise preventive measures. The results and insights from this study will provide a holistic framework to support both the traffic planners and the construction project engineers in their day-to-day safety planning for highway projects.
机译:建筑工作区施加了交通限制,并且仍然是造成高速公路事故的主要因素。为了补救事件的发生,有必要进行主动的危害识别和风险评估。现有文献中的现有框架和应用不足以在日常安全规划中吸收施工活动和动态交通流带来的危害。本文提出了一个新颖的框架,该框架利用了建筑安全模型和交通工程领域中模型提供的功能来解决此问题。具体而言,本研究系统地整合了基于活动的施工风险评估和基于模拟的交通冲突评估的结果,以量化公路建设中的日常风险。通过一个类似于实践的数字示例来演示此框架的应用。结果表明,通过按时间顺序将施工活动与工作区域周围的交通冲突进行整合来增强对施工活动的风险评估,可以更加真实,完整地捕获安全隐患。本研究中开发的综合安全评估指数将有助于准确表示危险工作区域的时间段,以制定预防措施。这项研究的结果和见解将提供一个整体框架,以支持交通规划人员和建筑项目工程师进行公路项目的日常安全规划。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号