首页> 外文会议>Sessions of Geo-Risk >Risk Determination for Tunnels and Other Networked Infrastructure
【24h】

Risk Determination for Tunnels and Other Networked Infrastructure

机译:隧道和其他网络基础设施的风险确定

获取原文

摘要

In this paper, we describe approaches to risk determination in underground construction. The center piece of what we describe are the Decision Aids for Tunneling (DAT), which allow one to predict cost-, time- and resource probability distributions reflecting uncertainties in geology and in the construction process but also many others. The DAT have been recently further developed so that they can treat linear or networked infrastructure projects such as highways or railroads. Some aspects such as the effect of correlation and individual construction process details have also been recently implemented. In parallel, approaches were developed with which one can determine the effect of exploration and how to best explore for tunnel projects. Philosophically related to exploration is a method with which the tunnel construction process can be continually updated to minimize the geotechnical risks. Finally, it is now possible to combine the DAT with an optimization tool using simulated annealing both for tunnels and for networked infrastructure. Very important is the practical application of all these approaches, and this is shown in the paper.
机译:在本文中,我们描述了地下建筑中风险确定的方法。我们所描述的中心部分是隧道决策辅助(DAT),它可以预测反映地质和施工过程中不确定性的成本,时间和资源概率分布,还可以预测许多其他情况。 DAT最近得到了进一步的发展,因此它们可以处理线性或联网的基础设施项目,例如高速公路或铁路。最近还实现了一些方面,例如相关性的影响和各个构造过程的详细信息。同时,人们开发出了可以确定勘探效果以及如何为隧道项目进行最佳勘探的方法。从理论上讲,勘探是一种方法,通过该方法可以不断更新隧道施工过程,以最大程度地降低岩土工程风险。最后,现在可以使用隧道和网络基础设施的模拟退火将DAT与优化工具结合起来。所有这些方法的实际应用都非常重要,这在本文中已进行了展示。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号