首页> 外文会议>IEEE Power and Energy Society General Meeting >A two-stage overload strategy of oil-immersed transformers considering operation risk
【24h】

A two-stage overload strategy of oil-immersed transformers considering operation risk

机译:考虑操作风险的油浸式变压器两阶段过载策略

获取原文

摘要

Recently, the incentive to improve transformer utilization driven by increasing power demands and financial pressure of new equipment investment is more and more strong. Existing study focus on overloading constraints like hottest-spot temperature (HST) and failure rate, but the transformer operation risk is rarely considered in overload strategy making. This paper firstly proposes an operation risk analytical method of oil-immersed transformers, to evaluate the transformer loss, power grid enterprise loss and society loss during overloading. Considering the operation risk, a two-stage overload strategy is presented. In stage 1, the security constraints including HST, failure rate and the proposed risk are discussed to obtain a preliminary strategy; in stage 2, benefits and costs of overloading are calculated to analyze the economy of strategies between preliminary strategy and full-loading, and the profit-optimal strategy will be chosen as the final strategy. The validity of proposed overload strategy and influence of transformer service time on strategy making is demonstrated through case study.
机译:近来,在电力需求增加和新设备投资的资金压力的推动下,提高变压器利用率的动力越来越强。现有研究集中在过载约束,例如最热点温度(HST)和故障率,但是在制定过载策略时很少考虑变压器的运行风险。本文首先提出了油浸式变压器的运行风险分析方法,以评估过载时的变压器损失,电网企业损失和社会损失。考虑操作风险,提出了一种两阶段过载策略。在第1阶段,讨论包括HST,失败率和建议的风险在内的安全约束,以获得初步策略;在第2阶段,计算超载的收益和成本,以分析初始策略和满载策略之间的经济性,然后选择利润最优策略作为最终策略。通过实例研究,证明了所提出的过载策略的有效性以及变压器的工作时间对策略制定的影响。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号