首页> 外文会议>IEEE Aerospace Conference >Space launch system, core stage, structural test design and implementation
【24h】

Space launch system, core stage, structural test design and implementation

机译:航天发射系统,核心阶段,结构试验设计与实现

获取原文

摘要

As part of the National Aeronautics and Space Administration's (NASA) Space Launch System (SLS) Program, engineers at NASA's Marshall Space Flight Center (MSFC) in Huntsville, Alabama are working to design, develop and implement the SLS Core Stage structural testing. The SLS will have the capability to return humans to the Moon and beyond and its first launch is scheduled for December of 2017. The SLS Core Stage consist of five major elements; Forward Skirt, Liquid Oxygen (LOX) tank, Intertank (IT), Liquid Hydrogen (LH2) tank and the Engine Section (ES). Structural Test Articles (STA) for each of these elements are being designed and produced by Boeing at Michoud Assembly Facility located in New Orleans, La. The structural test for the Core Stage STAs (LH2, LOX, IT and ES) are to be conducted by the MSFC Test Laboratory. Additionally, the MSFC Test Laboratory manages the Structural Test Equipment (STE) design and development to support the STAs. It was decided early (April 2012) in the project life that the LH2 and LOX tank STAs would require new test stands and the Engine Section and Intertank would be tested in existing facilities. This decision impacted schedules immediately because the new facilities would require Construction of Facilities (C of F) funds that require congressional approval and long lead times. The Engine Section and Intertank structural test are to be conducted in existing facilities which will limit lead times required to support the first launch of SLS. With a SLS launch date of December, 2017 Boeing had a need date for testing to be complete by September of 2017 to support flight certification requirements. The test facilities were required to be ready by October of 2016 to support test article delivery. The race was on to get the stands ready before Test Article delivery and meet the test complete date of September 2017. This paper documents the past and current design and development phases and the supporting processes, tools, and methodology for supporting the SLS Core Stage STA test stands and related STE. The paper will address key requirements, system development activities and project challenges. Additionally, the interrelationships as well as interdependencies within the SLS project will be discussed.
机译:作为美国国家航空航天局(NASA)太空发射系统(SLS)计划的一部分,位于阿拉巴马州汉斯维尔的NASA马歇尔太空飞行中心(MSFC)的工程师正在努力设计,开发和实施SLS核心阶段结构测试。 SLS将具有将人类送回月球及以后的能力,其首次发射定于2017年12月。前裙,液氧(LOX)箱,Intertank(IT),液氢(LH2)箱和发动机部分(ES)。波音公司正在位于路易斯安那州新奥尔良的米却德装配厂设计和生产每种元素的结构测试文章(STA)。将对核心阶段STA(LH2,LOX,IT和ES)进行结构测试由MSFC测试实验室提供。此外,MSFC测试实验室管理结构测试设备(STE)的设计和开发以支持STA。在项目生命周期的早期(2012年4月)决定,LH2和LOX储罐STA将需要新的试验台,发动机部分和Intertank将在现有设施中进行测试。该决定立即影响了进度,因为新设施需要设施建设(C of F)资金,这需要国会的批准和较长的交付时间。发动机部分和Intertank结构测试将在现有设施中进行,这将限制支持SLS首次启动所需的交付时间。 SLS的发布日期为2017年12月,因此波音有必要在2017年9月之前完成测试的日期,以支持飞行认证要求。测试设施必须在2016年10月之前准备就绪,以支持测试物品的交付。竞赛的开展是为了在测试文章交付之前做好准备,并在2017年9月完成测试日期。本文记录了过去和当前的设计和开发阶段以及支持SLS核心阶段STA的支持流程,工具和方法。测试台和相关的STE。本文将解决关键需求,系统开发活动和项目挑战。此外,还将讨论SLS项目中的相互关系和相互依赖性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号