首页> 外文会议>ASME Pressure Vessels and Piping conference >FAILURE ANALYSIS FOR WELDING OF PRIMARY LOOP PIPES IN HIGH-POWER PUMP TEST PLATFORM
【24h】

FAILURE ANALYSIS FOR WELDING OF PRIMARY LOOP PIPES IN HIGH-POWER PUMP TEST PLATFORM

机译:高功率泵测试平台主环管焊接失败的分析

获取原文

摘要

Welding of 15NiCuMoNb5-6-4 and austenitic stainless steel thickness pipes is necessary in the primary loop pipes installation for the platform. In the process of formulating welding procedure specification of the pipeline pre-welding between 15NiCuMoNb5-6-4 and Z3CN20-09M, some macroscopical cracks appeared repeatedly on the surface of bend-test specimens, while other performances of welding joints such as mechanical properties at room temperature, high temperature tensile properties and impact properties could meet the relevant codes requirements. Focus on present problem, chemical composition analyses, metallographic microstructures analyses and scanning electron microscope observation were adopted to find the welding failure root cause. Finally, INCONEL®152M and 52M with 30% chromium were chosen to be the welding materials because of good ductility dip cracking resistance. It was found that the performance of the welding joints could satisfy the codes and engineering requirements.
机译:在平台的主回路管道安装中,必须焊接15NiCuMoNb5-6-4和奥氏体不锈钢厚度的管道。在制定15NiCuMoNb5-6-4和Z3CN20-09M之间的管道预焊接的焊接工艺规范的过程中,弯曲测试样品的表面反复出现一些宏观裂纹,而焊接接头的其他性能(例如,室温下的高温拉伸性能和冲击性能可以满足相关规范的要求。针对目前的问题,采用化学成分分析,金相组织分析和扫描电镜观察法,找出焊接失败的根本原因。最后,选择具有30%铬的INCONEL®152M和52M作为焊接材料,因为它具有良好的延展性和抗开裂性。结果表明,焊接接头的性能可以满足规范和工程要求。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号