首页> 外文会议>IEEE International Conference on Industrial Engineering and Engineering Management >Multimode resource-constrained multi-project scheduling with ad hoc activity splitting
【24h】

Multimode resource-constrained multi-project scheduling with ad hoc activity splitting

机译:具有临时活动拆分的多模式资源受限的多项目计划

获取原文

摘要

This paper focuses on a multimode resource-constrained multi-project scheduling problem in an engineer-to-order company. During the execution of multiple projects, some activities should be split into sub-activities in an ad hoc manner according to the readiness of customers. Moreover, there is no prior information on when and how the activities need to be split. To deal with the problem which has not been addressed in previous research, an ad hoc activity splitting method and a simulated annealing algorithm is developed. A prototype scheduling system is developed and a case study for scheduling with ad hoc activity splitting is reported.
机译:本文重点研究了按订单设计的公司中的多模式资源受限的多项目计划问题。在执行多个项目的过程中,应根据客户的意愿将某些活动以临时方式分为子活动。此外,没有关于何时以及如何划分活动的事先信息。为了解决先前研究中尚未解决的问题,开发了一种特设活动分割方法和模拟退火算法。开发了原型调度系统,并报告了使用临时活动拆分进行调度的案例研究。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号