首页> 外文会议>Engineers' Society of Western Pennsylvania;Annual International Bridge Conference >Unique detailing and analysis for continuous reverse curved structure with partial staging
【24h】

Unique detailing and analysis for continuous reverse curved structure with partial staging

机译:带有部分分段的连续反向弯曲结构的独特细部和分析

获取原文

摘要

Staged construction for curved steel girder bridges must consider additional stage related loading and eccentricity conditions. Our bridge dealt with complex geometry of being 7-span fully joint-less, reverse curved (with tight 245-foot radius), and employed a unique partial staging of two-spans to minimize construction costs and impacts to the traveling public. We will cover the staging conditions analyzed to allow proper steel fit-up of a curved structure during construction, as well as the FEM developed.
机译:弯曲钢梁桥的分步施工必须考虑与阶段有关的附加荷载和偏心条件。我们的桥梁处理复杂的几何形状,即7跨度完全无接缝,反向弯曲(半径为245英尺),并采用独特的两跨度局部过渡措施,以最大程度地降低建筑成本和对出行公众的影响。我们将介绍分阶段条件,分析条件以允许在施工过程中对弯曲结构进行适当的钢装配,以及开发的FEM。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号