首页> 外文会议>Engineers' Society of Western Pennsylvania;Annual International Bridge Conference >Erecting/Moving/Raising/Floating a 1600 Ton Lift-Span Truss
【24h】

Erecting/Moving/Raising/Floating a 1600 Ton Lift-Span Truss

机译:架设/移动/提升/漂浮1600吨起跨桁架

获取原文

摘要

The new Fore River Bridge (a 328-ft, 1600 ton vertical lift span truss) will replace an existing“temporary” ACROW Bridge lift-span. The new truss was constructed on land on 20ft steel towers, rolled ontotwin 54ft x 180ft barges on four sets of two (8) axle SPMT units, lifted to a final vertical height of 70ft above thewater with self-raising towers and then floated into position with 3” of clearance between the erected towers andeach end of the bridge.
机译:新的Fore River桥(328英尺,1600吨的垂直举升跨度桁架)将取代现有的 “临时” ACROW桥升程。新的桁架是在20英尺高的钢塔上的陆地上建造的,滚动到 四对两(8)轴SPMT装置上的双54英尺x 180英尺驳船,抬高至最终垂直高度,高度为70英尺 用自升式水塔浇水,然后漂浮到竖立的水塔之间的间隙为3英寸的位置, 桥的每一端。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号