首页> 外文会议>North American Society for Trenchless Technology;North American Society for Trenchless Technology no-dig show >How a Permitting Agency’s Proactiveness can Contribute to the Success of a Microtunnel Project
【24h】

How a Permitting Agency’s Proactiveness can Contribute to the Success of a Microtunnel Project

机译:许可机构的积极性如何为微隧道项目的成功做出贡献

获取原文

摘要

Occasionally new trenchless construction causes damage to existing infrastructure requiring expensive fixes. Typically the infrastructure owner will protect itself through language in the encroachment permit while some agencies are taking a more proactive approach. Orange County Flood Control District (OCFCD) is one such agency. Motivated by a multi-million dollar repair to channel levees damaged by microtunneling, OCFCD has hired specialist trenchless consultants to monitor projects that could potentially affect County infrastructure. This paper discusses one such project.San Juan Creek is a channelized creek with concrete lined levees. Moulton Nigel Water District (MNWD) has installed a 48 inch steel casing beneath the creek by microtunneling for a 30-inch effluent transmission main, as replacement for the existing line that was exposed by scour in a flood event. Orange County Public Works (OCPW), on behalf of OCFCD retained trenchless specialists from Mott MacDonald to monitor and advise them on the microtunnel elements of the project. OCPW were reimbursed by MNWD as a condition of the encroachment permit.
机译:有时,新的非开挖式结构会损坏需要昂贵修理的现有基础设施。通常,当一些机构采取更主动的方法时,基础架构所有者将通过侵占许可证中的语言来保护自己。橙县防洪区(OCFCD)就是这样的机构之一。受数百万美元的维修动荡的影响,OCFCD聘请了专业的非开挖顾问来监视可能影响县基础设施的项目,这些隧道是由微型隧道破坏的通道。本文讨论了一个这样的项目。 圣胡安河(San Juan Creek)是一条带混凝土衬砌堤坝的沟渠小河。 Moulton Nigel水区(MNWD)通过微隧道安装了一条48英寸的钢制套管,通过一条微隧道安装了一条30英寸的污水传输主管,以替代因洪水而被冲刷暴露的现有管线。奥兰治县公共工程公司(OCPW)代表OCFCD聘请了Mott MacDonald的非开挖专家来对项目的微隧道要素进行监测并提供建议。 MNWD向OCPW报销了侵占许可证的条件。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号