【24h】

Performance of a Water Main CIPP Product Following 15 Years of Service

机译:经过15年的服务后,CIPP主水产品的性能

获取原文

摘要

In the mid-nineties, like in many other cities in North America, the City of Dollard-des-Ormeaux’s (D.D.O.) water distribution network was slowly deteriorating and there was an urgent need to start a water main assessment program and implement an integrated asset management program for the rehabilitation or renewal of its subsurface utilities. In the year 2000, the City of D.D.O. embarked in an extensive water main rehabilitation program and at that time, the City chose to rehabilitate its water mains, when possible, using cured in place pipes (CIPP). This new technology became a very attractive solution for the City since it offered many advantages such as reduced costs in comparison to the traditional open cut method, short construction times, minimal excavations, and reduced disruptions to citizen.
机译:与北美许多其他城市一样,在九十年代中期,Dollard-des-Ormeaux市(DDO)的供水网络正在缓慢恶化,迫切需要启动供水总管评估计划并实施一项综合资产地下公用设施的修复或更新管理程序。在2000年,D.D.O。市实施了广泛的水管修复计划,当时,纽约市选择使用现成的管道(CIPP)修复其水管。这项新技术成为纽约市非常有吸引力的解决方案,因为它具有许多优势,例如,与传统的露天开采方法相比,降低了成本,施工时间短,开挖最少,并减少了对居民的干扰。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号