Microtunneling the Paradise Whitney Interceptor

机译:微隧道天堂惠特尼拦截器

获取原文

摘要

The Clark County Water Reclamation District (CCWRD) needed to improve and increase the capacity of its aging Southeast Las Vegas Valley wastewater collection system. The result is the Paradise Whitney Interceptor (PWI), a $150 million dollar project which features over 13 miles of gravity sewer enhancements and represents the largest concentration of trenchless installed pipelines in the U.S. in over a decade. The project is split into three segments that channel through residential areas, around the McCarran Airport and end at the district’s main treatment facility.Nearly half of the 13 miles (26,143-linear feet), was installed with microtunneling and earth pressure balance equipment by Pipe Jacking/Frontier Kemper Joint Venture (PJ/FK). The PWI interceptor design includes 32, 60-76-inch trenchless alignments in sensitive to difficult geological circumstances, at vertical depths up to 45-feet, many in areas without surface access, amid traffic and an array of buried utilities. Several reaches that were originally specified as open-cut were switched to trenchless as a result of the CCWRD’s interest in mitigating property access limitations in the residential regions.
机译:克拉克县水垦区(CCWRD)需要改善和增加其老化的东南拉斯维加斯山谷废水收集系统的能力。结果就是天堂惠特尼拦截器(PWI),这是一个耗资1.5亿美元的项目,具有超过13英里的重力下水道增强功能,是美国十多年来非开挖安装管道的最大集中。该项目分为三部分,通过居民区,围绕麦卡伦机场,并终止于该地区的主要处理设施。 在13英里(26,143线性英尺)的近半数中,由Pipe Jacking / Frontier Kemper合资企业(PJ / FK)安装了微型隧道和土压平衡设备。 PWI拦截器的设计包括32个60-76英寸的非开挖对准线,这些区域在对困难的地质情况敏感的情况下,垂直深度达45英尺,许多区域无地面通行,交通拥挤,并且埋有公用设施。由于CCWRD希望减轻居住区的财产使用限制,因此将最初指定为明挖的几个河段切换为无挖沟。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号