Analysis of TBM Performance and Disc Cutter Consumption in Yinhanjiwei Water Conveyance Tunnel Project

机译:引韩济卫输水隧洞工程的掘进机性能和盘刀消耗分析。

获取原文

摘要

Two important aspects of excavation performance of TBM are advance rate and cutter replacement/ring consumption, which is closed to the cost and construction duration of the project. To achieve this, a database of TBM parameters and the geological-geotechnical conditions during the excavation of Yinhanjiwei was compiled and analyzed. Relationships between different geological and TBM operational parameters were investigated. Results of analyzes show that there are qualitative correlation between Field Penetration Index (FPI) and rock geological parameters. And strong relationships between FPI and operational parameters are suggested. In this study, the cutter replacement and ring consumption were analyzed using statistical method for preliminary estimation in similar conditions.
机译:TBM开挖性能的两个重要方面是前进速度和切刀更换/磨环消耗,这与项目的成本和工期无关。为此,建立并分析了尹汉吉围开挖过程中TBM参数和地质-地质技术条件的数据库。研究了不同地质参数与TBM作业参数之间的关系。分析结果表明,现场渗透指数(FPI)与岩石地质参数之间存在定性关联。并建议在FPI和操作参数之间建立牢固的关系。在这项研究中,使用统计方法分析了刀具的更换量和环消耗量,以便在类似条件下进行初步估算。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号