首页> 外文会议>ITA-AITES world tunnel congress >Predicted Risks Versus Actual Outcomes
【24h】

Predicted Risks Versus Actual Outcomes

机译:预测风险与实际结果

获取原文

摘要

Performing risk analyses on tunnel projects has become common place and on many projects it is required from an owner or regulatory perspective. After the project is planned, designed and constructed, the data concerning identified risks, assumptions, costs, probabilities and mitigations is generally long forgotten and buried in some file somewhere. A study was performed comparing predicted risks versus actual events on four recently constructed rock tunnel projects in New York, Ohio, Georgia and California. Probabilities and costs for selectively common risks on tunnel projects have been studied and re-evaluated. Conclusions are presented that can guide future projects and the veracity of the tunnel risk analyses performed.
机译:在隧道项目上执行风险分析已变得司空见惯,在许多项目中,从所有者或监管角度来看,这是必需的。在计划,设计和建造项目之后,与已识别风险,假设,成本,概率和缓解措施有关的数据通常会被长期遗忘,并被埋藏在某个地方的某个文件中。在纽约,俄亥俄州,乔治亚州和加利福尼亚州的四个最近建造的岩石隧道项目中,进行了一项研究,比较了预测风险与实际事件。研究并重新评估了隧道项目中选择性常见风险的概率和成本。提出的结论可以指导未来的项目以及所进行隧道风险分析的准确性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号