Impacts of the 2012-2015 Drought on the Brazilian Hydropower System

机译:2012-2015年干旱对巴西水电系统的影响

获取原文
获取外文期刊封面目录资料

摘要

The Brazilian interconnected power system consists of a set of over 150 medium and large hydropower plants, and is complemented by a large set of small hydropower plants, and thermal and wind power plants. Hydropower plants are operated to meet most of the energy demand, while the complementary system is dispatched to make up the shortage in supply. During 13 years from 2000 to 2012 on average 91% of Brazilian effective electric generation was provided by hydropower. However, in the last three years this percentage was reduced, in sequence, to 79, 73, and 71%. Intense and expensive thermal dispatch was necessary, while hydropower production was reduced and reservoir storages were drawn down. In the last three years, several major watersheds in Brazil have experienced a very severe drought. At the same time, the energy problem was exacerbated by demand increase and delayed expansion of the power system. To analyze the impacts of drought on the hydropower system, we propose to focus not only on the inflows but also on energy. Three variables were compared: historical reservoir inflows from 1930 to 2015, corresponding energy inflows, and optimal hydropower production. A nonlinear programming model, called HIDROTERM, previously developed for the hydrothermal system, was used to evaluate the optimal hydropower production under the historical inflows. We analyzed the intensity and duration of the historical droughts and evaluated the impacts of the most recent 2012-2015 severe drought on the Brazilian hydropower system.
机译:巴西的互联电力系统由150多个中型和大型水力发电厂组成,并辅以大量的小型水力发电厂,火力发电厂和风力发电厂。水力发电厂可以满足大多数能源需求,而配套系统则可以弥补供应不足的问题。从2000年到2012年的13年间,巴西平均有效发电量的91%由水力发电提供。但是,在最近三年中,该百分比依次降低到79%,73%和71%。必须进行激烈且昂贵的热力调度,同时减少水力发电的产量并减少水库的存储量。在过去的三年中,巴西的几个主要流域遭受了非常严重的干旱。同时,需求增加和电力系统扩展延迟加剧了能源问题。为了分析干旱对水力发电系统的影响,我们建议不仅关注流入量,还关注能源。比较了三个变量:1930年至2015年的历史水库流入量,相应的能源流入量以及最优的水力发电量。以前为水热系统开发的称为HIDROTERM的非线性规划模型用于评估历史流量下的最佳水力发电。我们分析了历史干旱的强度和持续时间,并评估了最近的2012-2015年严重干旱对巴西水电系统的影响。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号