Frequent failures and increased maintenance in a 30-year old 230kV air insulated switchyard (AIS) of a large gas plant had caused the existing installation to be unreliable to provide uninterrupted power supply to critical plant operations. The replacement parts from original equipment manufacturers became scarce and expensive. The maintenance activities in severe and extremely hot middle-east weather conditions were cumbersome and time consuming. A planned plant expansion with considerable incremental load to the facility provided an opportunity for a review of the complete electrical system. After a thorough review, it was decided to convert the main outdoor AIS to an indoor gas insulated switchgear (GIS) substation to support the existing and new facilities. However, a total loss of power to the continuous operation of this critical gas facility was unacceptable. The existing switchyard with an energized 230kV open bus system had limited space to safely perform the demolition and construction activities for the new GIS. Detailed analysis of the installation options, construction techniques, safety requirements and logistical methods was performed to eliminate potential for any total loss of power. The construction activity involved interfacing with two separate redundant power supply sources, with separate transmission line protection systems and equipment. The parties involved worked together in reaching an agreement on engineering, procurement, installation, testing and commissioning activities that would successfully implement this transition without any loss of power to the gas production facilities.
机译:一家大型煤气厂已有30年历史的230kV空气绝缘开关站(AIS)经常发生故障并增加了维护,导致现有设备不可靠,无法为关键工厂运行提供不间断电源。原始设备制造商的备件变得稀缺且昂贵。在恶劣和极端炎热的中东天气条件下的维护活动既麻烦又费时。计划中的工厂扩建将给工厂增加相当大的负载,这为审查整个电气系统提供了机会。经过全面审查后,决定将主要的室外AIS转换为室内气体绝缘开关设备(GIS)变电站,以支持现有设施和新设施。但是,此关键气体设施的连续运行造成的全部功率损失是不可接受的。现有的配有230kV敞开母线系统的开关站的空间有限,无法安全地进行新GIS的拆除和施工活动。对安装选项,施工技术,安全要求和后勤方法进行了详细分析,以消除潜在的总功率损耗。建设活动涉及与两个单独的冗余电源,带有单独的传输线保护系统和设备的接口。有关各方共同努力,就工程,采购,安装,测试和调试活动达成协议,该协议将成功实施这一过渡,而不会给天然气生产设施造成任何电力损失。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号