首页> 外文会议>Power plant pollutant control "MEGA" symposium >Enhanced Gas CoFiring Experience at Orlando Utilities
【24h】

Enhanced Gas CoFiring Experience at Orlando Utilities

机译:奥兰多公用事业公司增强的燃气联合点火体验

获取原文

摘要

With the implementation of MATS, the pending Clean Power Plan, depressed gas prices and an increasing emphasis on renewables, traditional coal-fired generating assets are looking for flexible solutions. Starting with the October 2012 outage, Stanton Energy Center began a long-range program to utilize increasing levels of natural gas in dual locations within Unit 1. High volume natural gas igniters replaced the existing oil-fired igniters in 2012 and Fuel Lean Gas Reburn for NOx reduction and upper-furnace use of natural gas was implemented in 2015. As the latest step in this program, Stanton is replacing two levels of the existing igniters with Breen's Dual-Orifice CoFiring igniters in 2016. This paper will document the environmental and performance results of each of those steps, the lessons learned during implementation, and project the long term impact of this combined coal/gas firing technology on long term compliance with MATS and CPP objectives.
机译:随着MATS的实施,未决的《清洁能源计划》,低迷的天然气价格以及对可再生能源的日益重视,传统的燃煤发电资产正在寻求灵活的解决方案。从2012年10月停运开始,斯坦顿能源中心开始了一项长期计划,以利用1号机组内两个地点的不断增加的天然气水平。2012年,高容量的天然气点火器取代了现有的燃油点火器, 2015年实施了NOx减少和天然气上层炉的使用。作为该计划的最新举措,Stanton将于2016年用Breen的Dual-Orifice CoFiring点火器取代现有水平的两个点火器。本文将记录环境和性能这些步骤中每个步骤的结果,实施过程中的经验教训,并预测该组合式燃煤/瓦斯燃烧技术对长期符合MATS和CPP目标的长期影响。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号