首页> 外文会议>International topical meeting on high temperature reactor technology >SUMMARY AND EXPERIENCE FEEDBACK ON THE RESTART AND POWER OPERATION AFTER A LONG TERM SHUTDOWN OF HTR-10
【24h】

SUMMARY AND EXPERIENCE FEEDBACK ON THE RESTART AND POWER OPERATION AFTER A LONG TERM SHUTDOWN OF HTR-10

机译:HTR-10长期关机后的重启和电源操作的总结和经验反馈

获取原文

摘要

After a long term shutdown, 10MW high temperature gas-cooled reactor (HTR-10) has been restarted in 2014 The main content of this process has been summarized and presented The preparation in the reactor shutdown stage, the characteristic tests after the restart, and the engineering practice and experience during the power operation of HTR-10, have been introduced in details The experience feedback on the restart process and power operation stage of HTR-10 have been proposed, including the equipment maintenance, technical transformation, routine test and inspection, modification of operational limits and conditions, and personnel training, etc
机译:长期停工后,2014年重启了10MW高温气冷堆(HTR-10)。该过程的主要内容已概述并介绍了反应堆停工阶段的准备工作,重新启动后的性能测试以及详细介绍了HTR-10的动力运行过程中的工程实践和经验。提出了有关HTR-10的重启过程和动力运行阶段的经验反馈,包括设备维护,技术改造,例行测试和检查,修改操作限制和条件以及人员培训等

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号