The 280MW KenGeb Olkaria Geothermal power project consists of two similar power plants namely Olkaria I Extension and Olkaria IV. They are located about ten kilometers apart. Each power plant includes connections of about twenty five high temperature geothermal steam wells covering an area of about ten square kilometers. The steam field development facilities include roads, steam and brine pipelines, separator stations, underground power supply and control cables and other system networks. Hazards in the steam field include, hot pipelines (up to 160°C), open ponds, hydrogen sulphide gas, loud noise during well testing or plant malfunction, and dust during construction.
机译:280兆瓦KenGeb Olkaria地热发电项目由两个类似的发电厂组成,即Olkaria I Extension和Olkaria IV。它们相距约十公里。每个发电厂包括约25平方公里面积的约25个高温地热蒸汽井的连接点。蒸汽田开发设施包括道路,蒸汽和盐水管道,分离站,地下电源和控制电缆以及其他系统网络。蒸汽领域中的危险包括:热管线(最高160°C),开放的池塘,硫化氢气体,试井或工厂故障期间的巨大噪音以及施工期间的灰尘。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号