首页> 外文会议>ITA-AITES world tunnel congress >Design and Engineering During the Construction of Los Leones Station (Line 6, Santiago Subway, Chile)
【24h】

Design and Engineering During the Construction of Los Leones Station (Line 6, Santiago Subway, Chile)

机译:Los Leones站(智利圣地亚哥地铁6号线)建设期间的设计和工程

获取原文

摘要

Los Leones Station, which belongs to the new Line 6 of Santiago Subway, is 19 m wide and is divided into two sections. The East Station Tunnel has 50 m of length and the overburden height is only 17 m while the West Station Tunnel has 55 m length and has been built 6 m below the Providencia parking lot. Like the rest of L6 Stations, the East Station Tunnel has been built with SSV method but the West Station Tunnel has been built with SFG method in order to decrease the induced subsidence on the Providencia parking lot; which shows no damages after the construction.
机译:属于洛杉矶地铁新6号线的Los Leones站宽19 m,分为两部分。东站隧道长50 m,上覆层高度仅为17 m,而西站隧道长55 m,建在Providencia停车场下方6 m。与其他L6站一样,东站隧道采用SSV方法建造,而西站隧道采用SFG方法建造,以减少对Providencia停车场的诱发沉降。施工后无损坏。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号