Technical Issues and Necessary Design Adaptations During Construction of Concrete Plugs for Hydrocarbon Underground Storages: Presentation of Four Cases of Design Changes Implemented During Construction

机译:地下碳氢化合物混凝土栓塞施工过程中的技术问题和必要的设计适应性:介绍在施工期间实施的四项设计变更案例

获取原文

摘要

The three first cases presented here have been successfully implemented on site, and the last case is currently under execution. These examples highlight how flexible the plug's design shall be in order to allow its adaptation along with the works. Some of the encountered situations are already taken into account by designers, such as the anticipation by geological investigation of sensitive areas and the risk of generalized overbreak at plug's periphery. Others remain more challenging to anticipate, especially when arising from divergent imperatives of the actors involved in the projects, such as the costs saving (and consequent lowering of the works quality) or the management of tight time schedules (and the associated changes in execution methods).
机译:此处介绍的前三个案例已在现场成功实施,最后一个案例目前正在执行中。这些示例突出了插头设计的灵活性,以使其随工程而变。设计人员已经考虑到了某些遇到的情况,例如对敏感区域进行地质调查的预期以及塞子外围普遍性溢出的风险。其他项目则更具挑战性,尤其是由于项目参与者之间的不同要求而产生时,例如节省成本(以及随之而来的工作质量降低)或管理紧迫的时间表(以及相关的执行方法变更) )。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号