首页> 美国政府科技报告 >Design and Construction of Deep Underground Basing Facilities for Strategic Missiles. Volume 1. Evaluation of Technical Issues
【24h】

Design and Construction of Deep Underground Basing Facilities for Strategic Missiles. Volume 1. Evaluation of Technical Issues

机译:战略导弹深层地下基础设施的设计与施工。第1卷。技术问题评估

获取原文

摘要

Volume 1 concerns the technical issues involved in basing missiles deep underground, in particular an assessment of the current and developing tunneling technology that would be important in designing, constructing, and egressing from, deep basing facilities. The Committee and Working Groups did not address the political and strategic issues. Following public briefings, the six Working Groups met in closed, separate sessions to consider the topics on which the Defense Nuclear Agency had asked for guidance: siting; use of existing underground space; egress; mechanical mining; construction planning; and management, contracting, costing, and personnel. On the basis of the findings of the Working Groups (see Chapters 3-8), the Committee developed its general and summary conclusions (see Chapter 2). It was agreed that layout, scheduling, machine performance, and site selection would have substantial impacts.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号