首页> 外文会议>ITA-AITES world tunnel congress >The Hirschhagen Highway Tunnel (BAB 44) in Germany: Pre-Support in Extremely Difficult and Inhomogeneous Ground Conditions
【24h】

The Hirschhagen Highway Tunnel (BAB 44) in Germany: Pre-Support in Extremely Difficult and Inhomogeneous Ground Conditions

机译:德国的Hirschhagen公路隧道(BAB 44):在极端困难和非均匀地面条件下的预支撑

获取原文

摘要

The 2nd longest German Tunnel Hischhagen is under construction since 2013. Since the beginning more than 50,000 meters of AT- Pipe Umbrella pipes with Squeezed Connection were installed and the following tunnel excavation safely executed. This successful application demonstrates that the newly developed Squeezed Connection in combination with the AT-Automation Unit improve both the structural behavior as well as the construction performance of pipe umbrella support. It ensures quicker overall installation times by a higher grade of mechanization, higher safety for the involved workforce by less rotating parts and less heavier pieces to handle and last but not least a high cost efficiency of the installed pipes as support element.
机译:自2013年以来,第二条最长的德国海斯哈根隧道正在建设中。自开始以来,安装了50,000多米长的带挤压连接的AT管道伞管,并安全地进行了以下隧道的开挖。这项成功的应用表明,新开发的Squeezed Connection与AT-Automation Unit结合使用可改善管伞支架的结构性能以及施工性能。通过更高的机械化程度,它可以确保更快的总体安装时间,所涉及的劳动力的安全性更高,因为旋转部件更少,搬运的零件也更少,并且作为支撑元件的已安装管道的成本效益很高,但同样重要的是。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号