Istanbul Strait Road Tube Crossing: Challenges, Risks and Mitigation Strategies

机译:伊斯坦布尔海峡公路过境点:挑战,风险和缓解策略

获取原文
获取外文期刊封面目录资料

摘要

The 13.2 m external diameter double deck Istanbul Strait Road Tube Crossing is one of the most challenging underwater tunnel projects in the world. Subjected to 11 bars of hydrostatic pressure, variable geology, and being in a very active seismic area, the execution of the project required innovative solutions, sophisticated construction techniques, and prudent risk management approach. The 5 km tunnel consists of 3.4 km TBM bored tunnel, 1 km twin NATM tunnels, and cut and cover sections. The project is being delivered in a Build-Operate-Transfer (BOT) contract in a public-private partnership. The technical challenges, coupled with financial and commercial risks required the implementation of sophisticated risk management tactics including the provision of Independent Design Verification. Presently, the project is in its advanced stages of construction with a recent successful TBM breakthrough on August 22nd 2015. The paper presents the technical challenges of the project from the design, construction, and risk management aspects and provides the status of the construction.
机译:外径为13.2 m的双层伊斯坦布尔海峡公路管道穿越是世界上最具挑战性的水下隧道项目之一。承受11巴的静水压力,变化的地质条件,并且处于非常活跃的地震区域,该项目的执行需要创新的解决方案,复杂的施工技术和审慎的风险管理方法。 5公里的隧道由3.4公里的TBM钻孔隧道,1公里的双NATM隧道以及切面和掩盖部分组成。该项目是通过公私合营的建造-运营-转让(BOT)合同交付的。技术挑战以及财务和商业风险要求实施复杂的风险管理策略,包括提供独立设计验证。目前,该项目正处于建设的高级阶段,最近在2015年8月22日成功实现了TBM的突破。本文从设计,施工和风险管理方面介绍了该项目的技术挑战,并提供了施工状况。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号