首页> 外文会议>International Conference on Electrical and Information Technologies for Rail Transportation >A U2P-Miner-Based Method to Identify Critical Energy-Consuming Parts of Urban Rail Operation System
【24h】

A U2P-Miner-Based Method to Identify Critical Energy-Consuming Parts of Urban Rail Operation System

机译:基于U2P-MINER的方法,以确定城市轨道运行系统的关键能耗部件

获取原文
获取外文期刊封面目录资料

摘要

Urban rail system is one of the most energy-consuming and highest costing public sectors in cities, and its energy efficiency has great potential to improve on the system level. The aim of this study is to introduce a novel method for identifying key energy-consuming parts based on univariate uncertain data pattern miner (U2P-miner) in order to improve the energy efficiency of urban rail system and to apply it in a real urban rail system. Firstly, an energy consumption association network model is constructed based on the operation energy consumption by analyzing the association among the energy use during operation. Secondly, a method for identifying critical nodes using U2P-miner algorithm is presented, which consider both topological and energy-consuming attributes of nodes. Finally, the proposed method is applied in Beijing Subway to help operator make better choices in energy efficiency improvement.
机译:城市铁路系统是城市中最具能耗和最高的公共部门之一,其能效具有巨大的改善系统级别。 本研究的目的是引入一种基于单变量不确定数据模式矿器(U2P-MINER)来识别关键能耗部件的新方法,以提高城市铁路系统的能效,并将其应用于真正的城市铁路 系统。 首先,通过分析操作期间的能量使用之间的关联来构造能量消耗关联网络模型。 其次,提出了一种使用U2P-MINER算法识别关键节点的方法,这考虑了节点的拓扑和能量消耗属性。 最后,在北京地铁应用该方法,帮助操作员在能效改善方面做出更好的选择。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号