首页> 外文会议>IEEE PES Asia-Pacific Power and Energy Engineering Conference >Distribution substation planning method based on weighted Voronoi diagram
【24h】

Distribution substation planning method based on weighted Voronoi diagram

机译:基于加权Voronoi图的配电变电站规划方法

获取原文

摘要

The characteristics of weighted Voronoi diagram and its application in power network planning introduced, according to target annual total load, existing substation capacity and candidate substation capacity type, determine the maximum and minimum number of the new substations, set loop variable, use integer programming optimization technique to obtain the combination of the a new station capacity. According to with or without the existing station, produce the initial location of the new substation respectively based on the regular Voronoi diagram method and the coordinate geometry method given the comprehensive consideration of planning region terrain features, regional area and load distribution; combine with the weighted Voronoi diagram and alternative location-allocation algorithm to determine the new substation site and the scope of power supply, find out the minimum annual cost correspondingly as the final plan.
机译:介绍了加权Voronoi图的特点及其在电网规划中的应用,根据目标年度总负荷,现有变电站容量和候选变电站容量类型,确定新变电站的最大和最小数量,设置回路变量,使用整数规划优化技术来获得新站点容量的组合。在考虑规划区域地形特征,区域面积和负荷分布的基础上,根据有无现有站,分别根据常规Voronoi图法和坐标几何法分别生成新变电站的初始位置;结合加权的Voronoi图和可替代的位置分配算法,确定新的变电站选址和供电范围,相应地找出最低年成本作为最终计划。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号