Estimation of levelized electricity cost of solar chimney power plant in India by using approximate cost model of Pretorius and Kroger

机译:利用Pretorius和Kroger的近似成本模型估算印度太阳能烟囱电厂的平均电力成本。

获取原文

摘要

This paper presents calculation of capital cost of solar chimney power plant of different capacities from 5 MW to 200 MW in India using approximate cost formula given by Pretorius and Kroger. The specific cost (Csc) of the chimney defined by Pretorius and Kroger is considered to estimate the approximate cost of SCPP using the cost model of Pretorius and Kroger. It is assumed that the average chimney thickness increment is 1 mm for every one meter height of the chimney. Using volume of material used for chimney and specific chimney cost capital cost of chimney is calculated. The collector cost was expressed in terms of specific chimney cost, height of the chimney, inlet height of the collector and the diameter of the collector. Energy conversion machinery cost is taken as a 10% of the sum of collector and chimney cost. For different plant capacities ranging from 5 MW to 200 MW, capital cost varies from Rs. 75.51 Cr to Rs. 1848.43 Cr and LEC is estimated as Rs. 4.22/kWh to Rs. 2.58/kWh under Indian conditions.
机译:本文介绍了使用Pretorius和Kroger给出的近似成本公式计算印度5兆瓦至200兆瓦不同容量的太阳能烟囱电厂的资本成本。考虑使用Pretorius和Kroger定义的烟囱的特定成本(Csc)来估计SCPP的近似成本。假设烟囱每增加一米,烟囱的平均厚度增量为1毫米。使用用于烟囱的材料量和特定烟囱成本,计算烟囱的资本成本。收集器的成本用特定的烟囱成本,烟囱的高度,收集器的入口高度和收集器的直径表示。能源转换机械的成本占集热器和烟囱成本之和的10%。对于从5兆瓦到200兆瓦的不同工厂容量,资本成本从卢比变化。 75.51 Cr为Rs。 Cr和LEC的估算值为1848.43 Rs。 4.22 / kWh至Rs。在印度条件下为2.58 / kWh。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号