首页> 外文会议>Paper conference and trade show >Detailed Project Planning Helps American Eagle Paper Mills Achieve Impressive Results
【24h】

Detailed Project Planning Helps American Eagle Paper Mills Achieve Impressive Results

机译:详细的项目计划帮助American Eagle造纸厂取得令人印象深刻的成果

获取原文

摘要

American Eagle Paper Mills in Tyrone, PA had a serious issue when they lost a drive bearing on a dryer can in their No. 3 Paper Machine. The failure caused severe journal damage and though the mill was able to complete an emergency field repair that allowed them to run for several more weeks, they knew the permanent fix involved replacing the dryer can. Working with OASIS Alignment Services, American Eagle developed an in-depth project plan for the removal of the damaged dryer can, the installation of the new dryer can and the alignment of all rolls within that section. This attention to detail prior to the start of the project resulted in the job being completed ahead of schedule and with a significant cost savings due to reduction in machine downtime.
机译:宾夕法尼亚州泰隆市的American Eagle造纸厂遇到了一个严重的问题,因为他们丢失了3号造纸机中烘干机罐上的驱动轴承。这次故障造成了严重的轴颈损坏,尽管工厂能够完成紧急现场维修,使他们可以再运行几个星期,但他们知道永久性的修理涉及更换干燥机的罐头。 American Eagle与OASIS对准服务一起,制定了深入的项目计划,以拆除损坏的干燥罐,安装新的干燥罐以及对准该部分中的所有卷筒。在项目开始之前对细节的关注导致工作提前完成,并且由于减少了机器停机时间,因此节省了大量成本。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号