METHODOLOGY TO ACCOUNT FOR LOAD FACTOR AND AVAILABILITY DURING CONCEPTUAL DESIGN PHASE OF A GEN IV NUCLEAR POWER PLANT

机译:第四代核电站概念设计阶段的负荷因子和可用度计算方法

获取原文

摘要

Increasing availability is a permanent objective of the nuclear plant designers and operators. For ASTRID SFR project, this consideration was taken into account at the very beginning of the reactor conceptual design. The parameters on which the plant designer can focus their action are : 1. The increase of the power production cycles duration, 2. The reduce of the refueling & inspection outages, 3. The increase of equipment reliability and parts availabilities. This overall work is conducted progressively and iteratively on all the ASTRID SFR reactor equipment and functions. This original work has led to : 1. identify the functions or equipment on which it was necessary to focus in priority. 2. Question on equipment or function failure consequences (and the solution to avoid being a "Driver"). 3. Set reliability targets by system or function and to assess gap between the target and the current design.
机译:可用性的提高是核电站设计者和运营者的永久目标。对于ASTRID SFR项目,在反应堆概念设计的一开始就考虑到了这一考虑。工厂设计人员可以集中精力执行的参数有:1.延长电力生产周期的持续时间; 2.减少加油和检查停机的时间; 3.提高设备的可靠性和零件可用性。总体工作是在ASTRID SFR反应堆的所有设备和功能上逐步进行的。这项原始工作导致:1.确定必须优先关注的功能或设备。 2.有关设备或功能故障后果(以及避免成为“驱动程序”的解决方案)的问题。 3.按系统或功能设置可靠性目标,并评估目标与当前设计之间的差距。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号