首页> 外文会议>Geotechnical and structural engineering congress >Targeted Ground Engineering for a Gas Plant in Pilbara Region, Australia
【24h】

Targeted Ground Engineering for a Gas Plant in Pilbara Region, Australia

机译:澳大利亚皮尔巴拉地区一家天然气厂的目标地面工程

获取原文

摘要

This paper presents the geotechnical challenges faced and targeted ground improvement adopted during the construction of a gas processing facility in the Pilbara region of Australia. The ground improvement solutions implemented on the project included dynamic replacement, rigid inclusions, stone columns, geogrids and geowebs. The ground improvement technologies are discussed in the following context (ⅰ) basis of selection, (ⅱ) design development details, (ⅲ) results of the pre-production/performance testing where available, (ⅳ) performance of constructed infrastructure where available, and (ⅴ) lesson's learned during construction. Additionally, the limited success of a high impact roller as an effective and efficient alternative to conventional sheep foot roller for earthwork compaction is also addressed.
机译:本文介绍了在澳大利亚的皮尔巴拉地区建设天然气处理设施期间面临的岩土技术挑战和针对性的地面改进。该项目实施的地面改善解决方案包括动态置换,刚性夹杂物,石柱,土工格栅和土工网。在以下情况下讨论了地面改良技术:(ⅰ)选择依据,(ⅱ)设计开发细节,(ⅲ)进行生产前/性能测试的结果,(ⅳ)进行施工的基础设施的性能,以及(ⅴ)在施工过程中吸取的教训。另外,还解决了高冲击力辊子作为土工压实的传统绵羊脚辊子的有效替代的有限成功。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号