首页> 外文会议>IEEE Power and Energy Society General Meeting >PMU placement for state estimation considering measurement redundancy and controlled islanding
【24h】

PMU placement for state estimation considering measurement redundancy and controlled islanding

机译:考虑测量冗余和受控孤岛的状态估计的PMU放置

获取原文

摘要

To select optimal locations for placing phasor measurement units (PMU), in this paper, a two-step convex optimization approach to attain the full network observability of a power system in both the normal operation conditions and controlled islanding operation conditions is proposed. The objective is to get the minimum number of PMUs which guarantees the system full observability with the maximum measurement redundancy. In the first step, a minimization model is applied to convex programing (cvx) to determine the minimum number of PMUs and all the possible candidate buses, which ensures the full network observability. In the second step, in the cases of multiple solutions, a maximization model is applied to cvx to maximize the measurement redundancy. Furthermore, the effect of zero-injection buses is considered to further reduce the number of required PMUs. The proposed approach is tested on three IEEE test systems, i.e. IEEE 14-bus, 30-bus and 118-bus, to demonstrate its effectiveness.
机译:为了选择合适的位置来放置相量测量单元(PMU),本文提出了一种两步凸优化方法,以在正常运行条件和受控孤岛运行条件下获得电力系统的全网可观测性。目的是获得最少数量的PMU,以确保系统具有完整的可观察性和最大的测量冗余度。第一步,将最小化模型应用于凸编程(cvx),以确定最小数量的PMU和所有可能的候选总线,以确保完整的网络可观察性。第二步,在有多个解决方案的情况下,将最大化模型应用于cvx以最大化测量冗余度。此外,零注入总线的作用被认为可以进一步减少所需PMU的数量。该方法在3种IEEE测试系统(即IEEE 14总线,30总线和118总线)上进行了测试,以证明其有效性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号